MR

Martian Rails

Areographic survey plate · milepost lattice · seam at 180°E

Round
1
Treasury
60
To build
20
Movement
0/9
Charter
0/5 · 250

Martian Rails

A crayon-rail game across the whole of Mars · 2 to 6 railroads

Lay grade between mileposts, run freight against waybills, and be the first railroad to reach the charter figure with all five major cities on one connected system.

The sheet wraps. The eastern edge of the plate is the western edge. The shortest alignment between two railheads is often the one that leaves the sheet.

Railroads

Opposition