Loading the board.
Two to six companies build across Great Britain. Each starts with GBP 60 million and takes two building turns before any train runs. The first company to hold GBP 250 million and join London, Birmingham, Manchester and Glasgow on one network wins — but the round is always played out, so every company gets the same number of turns.